Problems and requirements regarding integration of methods and tools across phases of the software-development life cycle are discussed. Information engineering (IE) methodology and I-CASE (integrated CASE) tools supporting IE claim to have an integrated view across major stages of enterprise-wide information-system development: information strategy planning, business area analysis, system design, and construction. In the main part of this paper, two comprehensive I-CASE tools, ADW (Application Development Workbench) and IEF (Information Engineering Facility), are analyzed and compared with regard to integration issues.